1.803.802.7330

CASE STUDY: Ecolab

all case studies

Project Summary


At Kay Chemical's Winston-Salem warehouse and distribution facility, Southpoint Solutions removed overhead T12s and engineered a new grid system utilizing new high performance T8 fluorescent fixtures. Some T12 strip fixtures were converted to T8 using Orion conversion kits, and all metal halide fixtures were replaced resulting in 64% increase in light levels and a 64% reduction in energy use.

Annual Energy Savings


$103,851

2,036,299

383.0

Environmental Impacts


2,674,699

lbs. per year

10,709

lbs. per year

3,943

lbs. per year

Reductions


374

Acres of Trees Planted Annually

168,099

Gallons of Gasoline Annually

329

Removed From the Road Annually

Testimonial


"The Orion energy efficient lighting platform delivered the right light at the right place at the right time and we saved a lot of money to boot." -- Lee Duvall, Facilities Engineering Manager

Project Photos


CASE STUDIES

Select A Category


Select A Case Study


TESTIMONIALS

CLIENTS

CAROLINAS OFFICE - HQ

SOUTHPOINT SOLUTIONS, LLC

9374 Old Bailes Road | Fort Mill, SC 29707

Phone: (803) 802-7330 | Fax: (803) 802-7332

 

SOUTHPOINT SOLUTIONS, LLC

P.O. BOX 470038 | Charlotte, NC 28247

Call Southpoint Solutions at 803-802-7330 to schedule a

Free Energy Audit

MAKE AN APPOINTMENT NOW

Copyright © 2011 Southpoint Solutions. All Rights Reserved | Charlotte Web Design and Development by Web Station, Inc.